EPC POWERPLANT

 

EPC Powerplant is a RE business segment engaging in Engineering, Procurement, Construction of Power Plant. As of 2021, RE through EPC Power plant had completed several projects, which among others are

Fast Track Project (FTP) 1

  • 1. CFSPP Ende, NTT (2×7 MW)
  • 2. CFSPP Kepri (2X7 MW)
  • 3. CFSPP Kendari (2X10 MW)
  • 4. CFSPP Tidore (2X7 MW)
  • 5. CFSPP Gorontalo (2X25 MW)
  • 6. GPP Ulumbu (2X2.5 MW)

RE trusted to work on a number of PLTG relocation projects including:

  • PLTG Grati 2×100 MW to Pesanggaran Bali, which aims to increase the electricity supply of the island of Bali during the G20 summit

In addition, to support the Government’s plan to increase the role of New and Renewable Energy in the national energy mix, and to develop Renewable Energy in Indonesia, Rekadaya Elektrika also participated in working on a number of PLTS such as:

  • Off grid Solar Power Plant in 6 Isolated Island in East Java
  • Pertamina Power Indonesia internal Solar Power Plant with a capacity of 9 MWp
EPC POWER PLANT PROJECTS
  1. PLTU Gorontalo 2×25 MW
  2. PLTU Kendari 2×10 MW
  3. PLTU Kepri 2×7 MW
  4. Ulumbu Geothermal PP 2×7 MW
  5. PLTU Tidore 2×7 MW
  1. PLTU Sorong (Ex-Timika) 4×7 MW
  2. PLTU Sofifi (2×3 MW
  3. PLTU Bima 2×10 MW
    Recovery Weir
  4. PLTMH Prafi 2 X 1.25 MW
  5. Relocation PLTG Grati to Pesanggaran 2 x 100 MW
  1. PLTU Ende 2×7 MW
  2. Solar PV Papua 782,2 kWp
  3. Solar PV Off Grid Isolated Island (Kangean & Bawean) 400 kWp
  4. Pekerjaan Pembangunan PLTS Internal Pertamina Cluster 2
  1. Pek Site Dev Fasilitas Regasifikasi LNG Sorong, Manokwari & Nabire
  2. PERBAIKAN WEIR PLTMH PRAFI 2 X 1.25 MW, PAPUA
  3. Supervisi Konstruksi & QA/QC PLTU 2 NTB-Lombok (2 x 25 MW)
  4. PEKERJAAN SOIL INVESTIGASI PLTU TIDORE 2X7 MW