EPC TRANSMISION


EPC Transmission is a RE business segment engaging in Power Transmission including the Construction of Extra High Voltage Substation (GITET), Construction of Transmission Line (TL), Extra High Voltage Air Channel (SUTET), High Voltage Air Channel (SUTT) among others:

1. 500 kV Batang – Ungaran Extra High Voltage Air Line (SUTET) and the 500 kV Indramayu – Cibatu SUTET which runs along the North Java line which is also the backbone of the Java – Bali electricity system.

2. T/L Malili – Lasusua is an electrical system interconnection project for Southern Sulawesi and Southeast Sulawesi (consisting of 103 towers) which was successfully completed in a fairly short period of 2 years and 2 months considering the location and extreme hilly terrain.

EPC TRANSMISSION PROJECTS
  1. TL & Substation 150 kV Blangpidie
  2. TL 275 kV Payakumbuh – G Sakti sec 2
  3. TL 275 kV Payakumbuh – G Sakti sec 3
  4. TL 275 kV Payakumbuh – G Sakti sec 4
  5. TL 150 kV Dumai – Bagansiapiapi sec 2 & Substation 150 kV Bagansiapiapi & Substation150 kV Dumai (EXT)
  6. TL 150 KV Perawang – New Garuda Sakti
    Procurement of Tower 275 kV Payakumbuh – Garuda Sakti sec 2
  7. TL 275 kV Sigli Ulee Kareng
    Transmission Completion Project of PT PLN (Persero UIP SBT (West Sumatra and Riau Provinces)
  8. TL 275 kV Payakumbuh – G Sakti sec 1
  9. TL Bangkinang – Pasir Pangarayan Sec 2
  10. TL 150 KV Dumai – Bagan Siapiapi sec 1
  11. TL 150 kV G Sakti – Pasir Putih
  12. TL Bangkinang – Pasir Pangarayan Sec 1
  13. TL 275 kV Perawang-New Garuda Sakti 2 CCT Sec 1
  14. TL Bangkinang – Pasir Pangarayan Sec 1
  15. TL 275 kV Perawang-New Garuda Sakti 2 CCT Sec 1
  1. TL 275 kV Perawang – New Garuda Sakti 2 CCT Sec 2
  2. TL 275 kV Perawang – New Garuda Sakti 4 CCT Sec 1
  3. TL 275 kV Perawang – New Garuda Sakti 4 CCT Sec 2
  4. Repairment of Tower TL 275 kV Padang Sidempuan – Payakumbuh
  5. TL 150 KV Muara Laboh – Sungai Rumbai Sec 1
  6. TL 150 KV Muara Laboh – Sungai Rumbai Sec 2
  7. TL 150 KV Muara Laboh – Sungai Rumbai Sec 3
  8. Procurement of Tower 275 kV Payakumbuh – Garuda Sakti sec 1
  9. Medium Voltage Sea Water Circuit  20 kV Tanjung Pasir – Pulau Untung Jawa
  10. UGC 150 kV  Ciledug – Alam Sutera (GIS)
  1. TL 275 kV Padang Sidempuan – Payakumbuh (1-10)
  2. TL 70 kV Gunung Sitoli-Teluk Dalam Sec. 1-4
  3. TL 150 kV Sidempuan & Payakumbuh (Sarula)
  4. TL 150 kV Tenayan-Perawang Sec. 1-2
  5. Voltage Quality Reinforcement Substation Banda Aceh
  6. TL 150 kV Tj .Redeb – Talisayan substation Sec. 2
  7. TL 150 kV Tj .Redeb – Talisayan substation Sec. 3
  8. TL 150 kV Malili-Lasusua Sec. 2
  9. TL 150 kV Jailolo – Sofifi
  10. TL 150 kV Jailolo – Malifut
  11. TL 70 kV Namrole – Namlea
  12. TL 150 kV Duren Tiga II/Ragunan-Cawang Lama
  13. TL 150 kV Kebon Sirih II (GIS) – Inc (Gambir Lama – Pulomas)
  1. UGC 150 kV Abadi Guna Papan (GIS) – Mampang (GIS)
  2. TL 150 kV Duren Tiga II/Ragunan-Depok II
  3. TL 150 kV Semanggi Barat Benhil – Inc
  4. TL 150 kV Masohi – Kairatu Substation
  5. TL 150 kV Piru – Kairatu Substation
  6. TL 500 kV PLTU Indramayu – Cibatu (Deltamas) sec 8
  7. TL 500 kV (Ungaran – Pedan) – Batang sec 1
  8. TL 150 kV Tanggul – Puger
  9. Re-Route Tower T19-T20 TL 70kV Maulafa – Naibonat
  10. UGC150 kV PLTU Gresik – PT Wilmar
    Relocation
  11. UGC 150 kV Ketapang – Mangga Besar
  12. TL 150 kV PLTS 145 MW Cirata
  13. TL 150 kV Poso – Sidera
  14. TL 20 KV Wakai – Togean
  15. 39.Proyek Penyempurnaan Transmisi Tersebar di Wilayah Kerja PT PLN (Persero) UIP SBT di Provinsi Sumbar dan Riau