Our Contacts

Building 18 Office Park Lt. 18
Jl. T.B. Simatupang No.18, Pasar Minggu,
South Jakarta - 12520
Indonesia

info@plnnpc.com

+62 (021) 2787 1818
+62 (021) 2770 8558

EPC SUBSTATION


EPC services tailored in accordance to your requirements and need for:

  • EPC Substation
  • Preliminary Site survey

Supported by integrated internal resources and a skilled team, we aim to provide timely and quality substations throughout Indonesia to strengthen electricity distribution throughout the country.

EPC SUBSTATION PROJECTS
  1. 150 kV Teluk Ratai Substation and Extention 2 LB 150 kV Pagelaran Substation
  2. TL & Substation KID Wina
  3. Substation 70/20 kV Teluk Dalam
  4. Substation 150 kV Panyambungan
  5. Substation 275 kV Perawang  (Dia. 2)
  6. Substation 150 kV Pinayungan (Ext)
  7. Substation 150 kV Arun
  8. Power Supply Aviasi 150 kV Tj. Morawa – Kualanamu
  1. Substation 150 kV New Padang Sidempuan
  2. Substation Infrastructure 150 kV Pondok Indah II/Cireundeu
  3. Substation 150 kV Jababeka
  4. Substation 70/20 kV Gunung Sitoli
  5. Substation 150/20 kV Perawang
  6. Substation 150 kV Tenayan (Ext)
  7. Substation 275/150 kV Perawang &
  8. Substation 150 kV Tenayan (Ext)
  9. Substation 150 kV Kembangan II
  1. Substation 150 kV Tj. Uban (Ext)
  2. Substation 150 kV Sei Mangke
  3. Substation 70 kV Dukong
  4. Substation 150 kV Teluk Jambe
  5. Substation 150 kV Sukamara
  6. Substation 150 kV Kuala Pembuang
  7. Substation 70 kV Labuan Bajo & Recommissioning
  8. Substation 70 kV Ruteng
    TL & Substation 150 kV Mamuju
  9. Substation 150/20 kV-30 MVA Jailolo
  1. Construction Work of the Tari’ful Fuad Ibtidaiyah Madrasah Celukan Bawang in Bali
  2. Relocation Mobile Trafo Talise Substation to Teling Substation
  3. Substation 500 kV Suralaya Lama
  4. Substation Infrastructure 150 kV Sepatan II
  5. Substation 150 kV Kayutangi
  6. Substation 150 kV Batulicin
  7. Substation 150 kV Kendari
  8. Substation 150 kV Incomer Guluk Guluk
  9. Substation 150kV PLTS 145 MW Cirata